Generac RTSJ200A3 PowerManager Load Shedding Transfer Switch

More Views

Generac RTSJ200A3 PowerManager Load Shedding Transfer Switch
$1,469.00
PowerManager LTS Load Shed Switch is designed to allow the most efficient use of the generator by monitoring and managing the backed up selected and non-selected circuits. Pair a smaller generator with the Powermanager switch and gain up to whole house coverage through load shedding. This switch cycles off non-essential circuits when the generator approaches overload condition, allowing essential circuits to remain powered.
Description

Details

PowerManager LTS Load Shed Switch is designed to allow the most efficient use of the generator by monitoring and managing the backed up selected and non-selected circuits. Pair a smaller generator with the Powermanager switch and gain up to whole house coverage through load shedding. This switch cycles off non-essential circuits when the generator approaches overload condition, allowing essential circuits to remain powered. When essential circuit demand is satisfied the non-essential circuits are powered back on. 200 Amp, service entrance rated, load shedding capability and 16 circuit load center built-in. This switch is designed to operate with the digital controls that are used on air-cooled and liquid cooled generators from 8 kW through 45 kW.

The LTS is housed in an aluminum NEMA 3R enclosure. It is service entrance rated at 200 amps and also has a built in 16 circuit priority load center. The main contactor protects the selected priority circuits while the secondary contactor protects the remaining, non-selected circuits located in the existing electrical panel. The cover is side hinged for easy access. Functions include utility coil voltage drop-out <60%. Standby coil voltage sensor 90%. Utility coil voltage pickup >80%. Load shed activation 58 Hz for >3 seconds or below 50 Hz for >1/2 second. Automatic load return adjustable.
Specifications
  • No. of Poles: 2
  • Current Rating (amps): 200
  • Voltage Rating (VAC): 250
  • Utility Voltage Monitor (fixed) Pick-up: 75%
  • Utility Voltage Monitor (fixed) Dropout: 65%
  • Return to Utility: approx. 15 sec.
  • Exerciser weekly for 12 minutes: Standard
  • UL Listed: Standard
  • Dimensions (H x W x D): 42" x 20" x 7.25"
  • Total of Pre-wired Circuits in Priority Load Center: 16
  • No. 15A 120V: 5
  • No. 20A 120V: 5
  • No. 20A 240V: 1
  • No. 40A 240V: 1
  • No. 50A 240V: 1
  • Circuit Breaker Protected Available RMS Symmetrical Fault Current @ 250 Volts: 10,000
  • Approximate Weight: 80 Lbs.
Additional Information

Additional Information

Reviews